Vantage has extensive project experience with regard to oil processing that range from conceptual and detailed studies to complete project execution and closeout. The following list represents a few of Vantage's highlights from past oil facility projects.

PCU 9 Battery 5000 BOPD (795 m3/d)

Vantage worked on systems including the free water knockout, treater, vapour recovery system, storage tanks and flare system. A full process review was required to ensure that either the existing equipment could handle the increased production, as well as well as new piping and equipment as required. This was a full service project that included conceptual studies, full regulatory support, scheduling, detailed engineering, construction management and project closeout.

Crystal Oil Battery 2500 BOPD (397 m3/d)

Capacity expansion project and evaluation of the existing 1.2 MMSCFD (35 e3m3/d) gas and 300 BOPD (50 m3/d) oil battery, to the new 5.0 MMSCFD (142 e3m3/d) gas and 2500 BOPD (397m3/d) oil battery. This full service project included conceptual studies, full regulatory support, scheduling, detailed engineering, construction management and project closeout. Key battery equipment included: free water knockout, treater, refrigeration, vapour recovery system, compression, storage tanks and flare system.