The team at Vantage has worked on numerous heavy oil projects on heavy oil facilities, pads and pipelines. These include projects on Cycle Steam Stimulation (CSS or sometimes known as "Huff and Puff"), Steam Assisted Gravity Drainage (SAGD), Cold Flow and heavy oil surface mining projects. Our staff has worked on various projects ranging from test wells, pilot projects, commercial plants along with optimization and debottlenecking of existing heavy oil facilities.